Methodology
This page documents the formulas and assumptions used in the calculator.
Engine Version
Current logic version: v1.0.0
Formulas (7th CPC)
- DA: Basic Pay × DA %
- HRA: Basic Pay × HRA Rate (30%, 20%, 10% for X, Y, Z cities)
- Gross: Basic + DA + HRA + TA
Projected Formulas (8th CPC)
- Basic: Current Basic Pay × Fitment Factor
- DA: Resets to 0% (Assumption)
- HRA: Assumed rates 24%, 16%, 8% for X, Y, Z cities
- Gross: Projected Basic + DA + HRA + TA